With the vertical integration of the general contracting industry chain as the core and facing the global market, CHMC provides engineering construction services in the primary modes of EP, EPC and BOT for thermal power generation, hydroelectric power generation, nuclear power generation, thermal cycle power generation, wind power generation and power transmission and transformation projects, forming a complete industrial chain of project establishment, feasibility studies, project planning, investment and financing, investigation, engineering design, construction, equipment supply, installation, commissioning and operation.
-
Pakistan 500 kV Thar-Matiari Double Circuit and Four Splitting Line EPC Project
The Pakistan 500 kV Thar-Matiari Double Circuit and Four Splitting Line EPC Project is located in Sindh Province, Pakistan, and is owned by the State Power Transmission and Distribution Corporation of Pakistan. CHMC has taken on project construction through EPC general contracting. The project includes a 500 kV double-circuit transmission line on the same tower with a total length of about 135 km. It is an important part of Pakistan's backbone power network.
-
CAMBODIA RURAL GRID EXTENSION PHASE Ⅲ & Ⅳ Project
CHMC has undertaken the project construction by EPC general contracting, and the owner of the project is ELECTRICITE DU CAMBODGE. The project covers 11 provinces in Cambodia, including nearly 1,300 km of medium-voltage lines and the installation of on-column equipment and underwater cables, linking transmission lines and substations along the Lao border and laying a solid foundation for Cambodia's goal of "electric power access for all villages". The project also plays an important role in improving the layout of Cambodia's national power grid and promoting local economic and social development.
-
CAMBODIA RURAL GRID EXTENSION PHASE Ⅱ PROJECT
CHMC has undertaken the project construction by EPC general contracting, and the owner of the project is ELECTRICITE DU CAMBODGE. The project includes 750 km of large capacity three-phase overhead lines for rural power grid, 50 km of underground cable lines, and 15 km of river crossing underwater cable lines. The project was completed and accepted in 2016.
-
CAMBODIA TRANSMISSION LINES AND SUBSTATIONS (115KV) FROM PHNOM PENH TO BAVET PROJECT
CHMC has undertaken the project construction by EPC general contracting, and the owner of the project is ELECTRICITE DU CAMBODGE. The project includes a 160 km 115 kV transmission line from Phnom Penh, the capital of Cambodia, to Bavet,a border city of Vietnam, as well as two new substations and one substation extension. The project construction commenced in 2013 and was completed and put into operation in 2016.
-
Myanmar Tigyit Coal-Fired Power Plant
The Tigyit Power Plant is the first coal-fired power plant in Myanmar, with a total installed capacity of 2 x 60 MW. The project is highly valued by the Myanmar government. CHMC signed a general contract with Myanmar State Electric Power Co., Ltd., and is responsible for the design, supply, civil construction and installation of complete sets of equipment for the power plant. The completed power station has alleviated the pressure of electricity consumption during Myanmar’s dry season and filled the gap of thermal power generation in Myanmar.